- 0Carrito
-
Su carrito está vacío.
-
más artículos en el carro...
Carro Total: $0.00
Pasar por caja
Su carrito está vacío.
Carro Total: $0.00
Pasar por caja
|
Item specifics
Product Description
Technical Parameters● Rated current (ln): 10A, 16A, 20A, 25A, 32A, 40A, 50A, 63A● Rated residual operating current: 30mA (Standard Default), 15mA (Customized), 50mA (Customized), 100mA (Customized), 300 mA (Customized) ● Funtions: □ Overcurrent fault: circuit breaker and residual current action device reset at the same time □ Leakage fault: the residual current operating device shall be reset first, and the circuit breaker shall be reset later □ Lightning protection fault: the lightning protection device shall be reset first, and the circuit breaker shall be reset later ● Poles: 2P (single-pole two-wire residual current action circuit breaker) ● Trip Type: C type (5 ~ 10) In (strandard default) and D type (10~16)ln (customized) ● Rated voltage Un (v): AC 220V-250V, 110V-127V (Customized) ● Rated isolation voltage: 500V ● Lightning Protection Level: 3 ● Rated short-circuit capability Lcb (A): 6kA ● Insulation impulse voltage: 8KV ● Electrical life: 10000 ● Mechanical life: 20000 ● Standard: IEC61009-1 ● Warranty: 18th MonthCircuit Wiring Recommend 1, Doulbe light (2P-PE) with PE port, built-in lightning protection module, can wiring to ground, with better lightning protection capabilities (Recommend to order this specification)2, Single light with out PE, need not wiring to ground, with over-voltage and over current module, lightning protection can be limited to a certain extent 3, Be used for a main switch, please select 40 Amp to 63 Amp. Be used for a sub switch, please select 10 Amp to 32 Amp 4, Please follow the top-in-bottom-out wiring method, it is not recommended to use the bottom-in and top-out wiring method, which may damage the protectorLight Indicate 2P-PE (Double Light):Power on: the red light trun on Ground light wired: green light turn on When the circuit breaker on protecting status, the red light flash 2P No PE (Single Light): Power on: the light trun on to red color When the circuit breaker on protecting status, the red light flashProduct Size (Unit mm) Structure Introduction 1: Power input and output terminals (Maximum 16mm2 (5 AWG) cable can be connected).2: PE port terminals ground cable can be connected 3: Status window, red means power is on, green means power is off (circuit breaker triped). 4: Manual opening and closing handle: turn up to turn on the power supply, turn down to turn off the power supply. 5: Test button, turn on the power and then press this button can test whether the leakage protection function is good: If the circuit breaker is triped, it means that the leakage protection function is good; If the circuit breaker does not trip, it means that the leakage protection function is faulty, please replace the circuit breaker in time. 6: Power on indicate light 7: Ground connected light 8: Leackage protection indicate and reset button, please press down this button before you want to recovery the power supplyMounting and Fixed DZ47LED can be fixed on DIN rail directly, can be placed in a distribution boxPlease try to keep the vertical installation, and use the top-in and bottom-out wiring method, in order to obtain the best protection performance and the longest service lifePeakage Details 3 Types Peakage:1, 1 pc items in one box 2, 3pcs items in one box 3, 45pcs items in one boxAbout Customization 1, Colors: Red, Blue, Green color can be customized.2, Although our product can adapt to most single-phase voltages, if the suitable voltage is strictly required, we can customize the voltage for you, such as 110V, 127V (be used for United States, Canada, Mexico and other countries) voltage can be customized. 3, The default leackage current is 30ma, we can also custom 15ma, 50ma, 100ma, 300ma etc for you, just remark or leave a message on customer service windows. So important is: as you know, customization need add some price and minimum order quantity required, but don’t warry, we will custom-made at your satisfactory price.About Shipping1, No more than 2kg weight: Shipping by Officematics Standard (20-35days) Shipping by China Post (20-35days) 2, More than 2kg weight: Shipping by Officematics Standard (20-35days), China Post (20-35days), FEDEX (7-15days), UPS (7-15days), TNT (7-15days), other express direct lines (10-20days). We will choose the appropriate logistics according to the actual situation 3, Above delivery date is applicable for most cases. However sometimes parcels may be delayed fo holiday, festival, bad weather, custom, Etc. Besides Express shipping way may have tax issue. In those case, your comprehension and cooperation is highly appreciated 4, Shipping ways and track website: Receiving and After-sales Service1, Please check the tracking information on tracking website2, Please |